Commercial Roofing Internal Works At Currys
- Removed the existing bulk-head above the main front entrance in order to gain access for the roller shutter to be repaired.
- Installed a new plasterboard bulkhead once the works were completed to the roller shutter and redecorated the bulkhead and columns.